1. Container, RO-RO, and bulk materials traffic
is conducted in the pier of Cos Nou.
3 docking alignments of 93, 211, and 106 m respectively,
and a depth of 7 m with 3 ramps RO-RO, 3 cranes of 30 T for containers
and bulk materials, unloading of cement in bulk, and water service at the
pier.
2. Passenger traffic and cruise ships at the pier
Comercial
Poniente (West) docking alignment of 184 m and
a depth of 9 m with ramp RO-RO, marine station with portable gangway, water
service, removal of solid waste.
Levante (East) docking alignment of 360 m and
a depth of 9 m with ramp RO-RO, water service, removal of solid waste and
waste water.
3. Fuel and oil products at the pier Cala Figuera, with 140 m of docking and unloading facilities.
4. Anchoring
Zone II to the SE of point Esperó, no limit
on length and depth
Zone I to the west of the Isla del Rey, depth
9 m